Welcome to Auto, Motorcycle Parts & Accessories official website!
Chain Tensioner for Honda CRF250: High Performance

Chain Tensioner for Honda CRF250: High Performance

Chain Tensioner for Honda CRF250: High PerformanceThis chain tensioner is built for the Honda CRF250 and supplied to a written specification, so the part that comes off the line in the next order.

Contact Number:
Product Details

Chain Tensioner for Honda CRF250: High Performance

This chain tensioner is built for the Honda CRF250 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the high performance programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: lead time that slipped twice before bulk started, or documentation that arrived after the container shipped. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Chain Tensioner for Honda CRF250

Specification

PartChain Tensioner
FitmentHonda CRF250
VersionHigh Performance
Base materialHigh Density Foam
Typical useMining Sites
MOQ3,000 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time25-45 days after approval
ComplianceREACH

What decides whether it lasts

  • Material — High Density Foam is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Honda CRF250 mounting, not on a catalogue drawing.
  • Finish — a sealed surface treatment holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Chain Tensioner production

Processes used on this line

  • precision stamping
  • shot blasting
  • assembly line testing
  • rubber vulcanisation
  • anodising
  • ultrasonic cleaning

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The high performance build is the one most often ordered for mining sites. Riders also fit it for night riding, delivery fleets, mountain roads, urban courier work.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What is the minimum order quantity?

The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the REACH-compliant build instead of a fresh interpretation.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top