Welcome to Auto, Motorcycle Parts & Accessories official website!
Steering Bearing for Husqvarna FE 350: OEM Replacement

Steering Bearing for Husqvarna FE 350: OEM Replacement

Steering Bearing for Husqvarna FE 350: OEM ReplacementThis steering bearing is built for the Husqvarna FE 350 and supplied to a written specification, so the part that comes off the line in the next.

Contact Number:
Product Details

Steering Bearing for Husqvarna FE 350: OEM Replacement

This steering bearing is built for the Husqvarna FE 350 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the oem replacement programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: a specification nobody had written down, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Steering Bearing for Husqvarna FE 350

Specification

PartSteering Bearing
FitmentHusqvarna FE 350
VersionOEM Replacement
Base materialHigh Density Foam
Typical useMining Sites
MOQ3,000 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time25-60 days after approval
ComplianceTUV

What decides whether it lasts

  • Material — High Density Foam is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Husqvarna FE 350 mounting, not on a catalogue drawing.
  • Finish — anodising holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Steering Bearing production

Processes used on this line

  • injection moulding
  • die casting
  • electroplating
  • laser cutting
  • assembly line testing
  • CNC machining

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The oem replacement build is the one most often ordered for mining sites. Riders also fit it for night riding, airport ground fleets, roadside assistance, food delivery.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the TUV-compliant build instead of a fresh interpretation.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

What is the minimum order quantity?

The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top