Welcome to Auto, Motorcycle Parts & Accessories official website!
Relay for Zongshen 150: Two-Piece Construction

Relay for Zongshen 150: Two-Piece Construction

Relay for Zongshen 150: Two-Piece ConstructionThis relay is built for the Zongshen 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one.

Contact Number:
Product Details

Relay for Zongshen 150: Two-Piece Construction

This relay is built for the Zongshen 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the two-piece construction programme stable once it moves from first order to repeat order.

Most buyers come to us after something went wrong: lead time that slipped twice before bulk started, or inconsistent hardness between lots. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Relay for Zongshen 150

Specification

PartRelay
FitmentZongshen 150
VersionTwo-Piece Construction
Base materialBrass
Typical useOff-Road Trails
MOQ200 pieces per specification
Sampling14 working days, 5 days per revision
Bulk lead time30-60 days after approval
ComplianceISO 9001

What decides whether it lasts

  • Material — Brass is the base; treat any substitution as a new approval.
  • Hardness and heat treatment — recorded per lot, not per batch of paperwork.
  • Fitment tolerance — checked on the actual Zongshen 150 mounting, not on a catalogue drawing.
  • Finish — powder coating holds up where the machine sees salt, mud and daily washing.
  • Packing — individual packing plus inner cartons sized for the workshop bench.

Relay production

Processes used on this line

  • die casting
  • CNC machining
  • gravity casting
  • ultrasonic cleaning
  • sintering
  • precision stamping

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The two-piece construction build is the one most often ordered for off-road trails. Riders also fit it for daily commuting, wet weather riding, construction sites, ride-hailing fleets.

Ordering

  1. Confirm the model year and frame number before ordering.
  2. Approve a sample made from the actual bulk material.
  3. Fix the packing and marking at quotation stage.
  4. Book inspection before the balance payment, not after it.

Questions buyers ask

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO 9001-compliant build instead of a fresh interpretation.

What is the minimum order quantity?

The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top