Steering Bearing for Beta RR 300: All-Weather Version
This steering bearing is built for the Beta RR 300 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the all-weather version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: a fitment that looked right on paper and failed on the bench, or a fitment that looked right on paper and failed on the bench. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Steering Bearing |
|---|---|
| Fitment | Beta RR 300 |
| Version | All-Weather Version |
| Base material | ABS Plastic |
| Typical use | Food Delivery |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Bulk lead time | 25-60 days after approval |
| Compliance | ISO 9001 |
What decides whether it lasts
- Material — ABS Plastic is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Beta RR 300 mounting, not on a catalogue drawing.
- Finish — powder coating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- electroplating
- rubber vulcanisation
- cold forging
- sintering
- powder coating
- die casting
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The all-weather version build is the one most often ordered for food delivery. Riders also fit it for security patrols, mining sites, construction sites, ride-hailing fleets.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO 9001 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO 9001-compliant build instead of a fresh interpretation.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







