Headlight for Bajaj Boxer 150: Long Life Version
This headlight is built for the Bajaj Boxer 150 and supplied to a written specification, so the part that comes off the line in the next order matches the one you approved. Fitment, base material and finish are fixed before sampling starts — that is what keeps the long life version programme stable once it moves from first order to repeat order.
Most buyers come to us after something went wrong: warranty claims traced back to a single lot, or a specification nobody had written down. Both are avoidable when the specification is written down before bulk and the approved sample is kept as the reference.

Specification
| Part | Headlight |
|---|---|
| Fitment | Bajaj Boxer 150 |
| Version | Long Life Version |
| Base material | Stainless Steel |
| Typical use | Passenger Transport |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 30-45 days after approval |
| Compliance | E-mark |
What decides whether it lasts
- Material — Stainless Steel is the base; treat any substitution as a new approval.
- Hardness and heat treatment — recorded per lot, not per batch of paperwork.
- Fitment tolerance — checked on the actual Bajaj Boxer 150 mounting, not on a catalogue drawing.
- Finish — zinc plating holds up where the machine sees salt, mud and daily washing.
- Packing — individual packing plus inner cartons sized for the workshop bench.

Processes used on this line
- rubber vulcanisation
- robot welding
- heat treatment
- gravity casting
- anodising
- cold forging
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The long life version build is the one most often ordered for passenger transport. Riders also fit it for track days, farm use, daily commuting, long-distance touring.
Ordering
- Confirm the model year and frame number before ordering.
- Approve a sample made from the actual bulk material.
- Fix the packing and marking at quotation stage.
- Book inspection before the balance payment, not after it.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the E-mark-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







