Central Locking Kit for Audi A4: Sintered Metal
This central locking kit for the Audi A4 is specified around sintered metal, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a specification nobody had written down, or inconsistent hardness between lots. Both are specification problems, and both are preventable.

Specification
| Product | Central Locking Kit |
|---|---|
| Vehicle application | Audi A4 |
| Material / finish | Sintered Metal |
| Typical use | Heavy Load Hauling |
| MOQ | 1,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 20-30 days after approval |
| Compliance | TUV |
| Packing | 50 pieces per inner box, 200 per carton |
Material options
- Cast Iron — selected when the part is exposed to weather and road salt
- PU Leather — preferred when weight matters more than rigidity
- Forged Aluminium — the cost-effective default for volume programmes
- Bronze — preferred when weight matters more than rigidity
- PVC Coated Fabric — specified where the part sits close to a heat source

Processes available
- CNC machining
- heat treatment
- laser cutting
- sintering
- die casting
- cold forging
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for heavy load hauling. Related applications include wet weather riding, passenger transport, security patrols, construction sites, roadside assistance.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







