Welcome to Auto, Motorcycle Parts & Accessories official website!
Steering Rack for Audi A4: Sintered Metal

Steering Rack for Audi A4: Sintered Metal

Steering Rack for Audi A4: Sintered MetalThis steering rack for the Audi A4 is specified around sintered metal, which decides how it behaves in service far more than the part name does. We build to a.

Contact Number:
Product Details

Steering Rack for Audi A4: Sintered Metal

This steering rack for the Audi A4 is specified around sintered metal, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is premature wear on the first batch, or reorders that did not match the approved sample. Both are specification problems, and both are preventable.

Audi A4 Steering Rack

Specification

ProductSteering Rack
Vehicle applicationAudi A4
Material / finishSintered Metal
Typical useRide-Hailing Fleets
MOQ3,000 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time20-40 days after approval
ComplianceDOT
Packing20 pieces per inner box, 1000 per carton

Material options

  • Nylon 66 — preferred when weight matters more than rigidity
  • Aluminium Alloy — preferred when weight matters more than rigidity
  • Stainless Steel — the cost-effective default for volume programmes
  • PU Leather — used when the finish has to hold a coating
  • Neoprene — selected when the part is exposed to weather and road salt

Steering Rack detail

Processes available

  • injection moulding
  • assembly line testing
  • cold forging
  • rubber vulcanisation
  • heat treatment
  • anodising

Fitment notes

Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.

Where it is used

The specification above is the one most often ordered for ride-hailing fleets. Related applications include daily commuting, urban courier work, track days, farm use, roadside assistance.

Quality and packing

  • In-line inspection with AQL 2.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What testing is included?

Standard lots ship with dimensional and hardness reports. DOT documentation is issued with the shipment when your market requires it.

Send the specification you are working to and we will confirm what we can match, what we would change and why.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top