Radar Detector for Geely Coolray: Zinc Plated Steel
This radar detector for the Geely Coolray is specified around zinc plated steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or inconsistent hardness between lots. Both are specification problems, and both are preventable.

Specification
| Product | Radar Detector |
|---|---|
| Vehicle application | Geely Coolray |
| Material / finish | Zinc Plated Steel |
| Typical use | Ride-Hailing Fleets |
| MOQ | 2,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 20-40 days after approval |
| Compliance | RoHS |
| Packing | 50 pieces per inner box, 1000 per carton |
Material options
- EPDM Rubber — selected when the part is exposed to weather and road salt
- Nylon 66 — selected when the part is exposed to weather and road salt
- Silicone — preferred when weight matters more than rigidity
- Brass — chosen where wear resistance comes first
- Kevlar Composite — the cost-effective default for volume programmes

Processes available
- heat treatment
- rubber vulcanisation
- robot welding
- shot blasting
- cold forging
- electroplating
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for ride-hailing fleets. Related applications include construction sites, track days, night riding, rental fleets, daily commuting.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







