AC Hose Pipe for Nissan X-Trail: Semi-Metallic Compound
This ac hose pipe for the Nissan X-Trail is specified around semi-metallic compound, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is inconsistent hardness between lots, or inconsistent hardness between lots. Both are specification problems, and both are preventable.

Specification
| Product | AC Hose Pipe |
|---|---|
| Vehicle application | Nissan X-Trail |
| Material / finish | Semi-Metallic Compound |
| Typical use | Passenger Transport |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 15-30 days after approval |
| Compliance | SGS |
| Packing | 100 pieces per inner box, 200 per carton |
Material options
- Carbon Fibre Composite — the cost-effective default for volume programmes
- Semi-Metallic Compound — the cost-effective default for volume programmes
- Aluminium Alloy — used when the finish has to hold a coating
- ABS Plastic — specified where the part sits close to a heat source
- EPDM Rubber — selected when the part is exposed to weather and road salt

Processes available
- laser cutting
- precision stamping
- die casting
- assembly line testing
- powder coating
- injection moulding
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The specification above is the one most often ordered for passenger transport. Related applications include heavy load hauling, adventure travel, daily commuting, rural transport, urban courier work.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







