Welcome to Auto, Motorcycle Parts & Accessories official website!
PCV Valve for Great Wall Poer: Stainless Steel

PCV Valve for Great Wall Poer: Stainless Steel

PCV Valve for Great Wall Poer: Stainless SteelThis pcv valve for the Great Wall Poer is specified around stainless steel, which decides how it behaves in service far more than the part name does. We.

Contact Number:
Product Details

PCV Valve for Great Wall Poer: Stainless Steel

This pcv valve for the Great Wall Poer is specified around stainless steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is inconsistent hardness between lots, or warranty claims traced back to a single lot. Both are specification problems, and both are preventable.

Great Wall Poer PCV Valve

Specification

ProductPCV Valve
Vehicle applicationGreat Wall Poer
Material / finishStainless Steel
Typical useDelivery Fleets
MOQ3,000 pieces per specification
Sampling7 working days, 5 days per revision
Bulk lead time25-40 days after approval
ComplianceREACH
Packing10 pieces per inner box, 1000 per carton

Material options

  • Kevlar Composite — specified where the part sits close to a heat source
  • Stainless Steel — the cost-effective default for volume programmes
  • Carbon Steel — specified where the part sits close to a heat source
  • Forged Aluminium — the cost-effective default for volume programmes
  • Semi-Metallic Compound — the cost-effective default for volume programmes

PCV Valve detail

Processes available

  • cold forging
  • precision stamping
  • laser cutting
  • powder coating
  • surface grinding
  • gravity casting

Fitment notes

Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.

Where it is used

The specification above is the one most often ordered for delivery fleets. Related applications include daily commuting, rural transport, adventure travel, ride-hailing fleets, farm use.

Quality and packing

  • In-line inspection with AQL 2.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

What is the minimum order quantity?

The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top