Drive Shaft for Citroen C5 Aircross: Tempered Glass
This drive shaft for the Citroen C5 Aircross is specified around tempered glass, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or inconsistent hardness between lots. Both are specification problems, and both are preventable.

Specification
| Product | Drive Shaft |
|---|---|
| Vehicle application | Citroen C5 Aircross |
| Material / finish | Tempered Glass |
| Typical use | Delivery Fleets |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 25-30 days after approval |
| Compliance | SGS |
| Packing | 10 pieces per inner box, 500 per carton |
Material options
- EPDM Rubber — the cost-effective default for volume programmes
- Semi-Metallic Compound — chosen where wear resistance comes first
- Polypropylene — the cost-effective default for volume programmes
- Sintered Metal — preferred when weight matters more than rigidity
- Reinforced Nylon — selected when the part is exposed to weather and road salt

Processes available
- electroplating
- anodising
- injection moulding
- sintering
- gravity casting
- rubber vulcanisation
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for delivery fleets. Related applications include coastal delivery, adventure travel, urban courier work, weekend riding, night riding.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Ask for the current catalogue and the specification sheet for this line.







