Power Steering Pump for Kia Sorento: Sintered Metal
This power steering pump for the Kia Sorento is specified around sintered metal, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is premature wear on the first batch, or packing that arrived crushed at the port. Both are specification problems, and both are preventable.

Specification
| Product | Power Steering Pump |
|---|---|
| Vehicle application | Kia Sorento |
| Material / finish | Sintered Metal |
| Typical use | Weekend Riding |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 25-30 days after approval |
| Compliance | TUV |
| Packing | 20 pieces per inner box, 1000 per carton |
Material options
- Carbon Steel — used when the finish has to hold a coating
- PVC Coated Fabric — chosen where wear resistance comes first
- EPDM Rubber — chosen where wear resistance comes first
- Sintered Metal — chosen where wear resistance comes first
- Stainless Steel — selected when the part is exposed to weather and road salt

Processes available
- shot blasting
- die casting
- injection moulding
- CNC machining
- rubber vulcanisation
- cold forging
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for weekend riding. Related applications include ride-hailing fleets, mountain roads, heavy load hauling, weekend riding, construction sites.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 1000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
Ask for the current catalogue and the specification sheet for this line.







