Fuel Tank Cap for RAM 1500: Chromed Steel
This fuel tank cap for the RAM 1500 is specified around chromed steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is inconsistent hardness between lots, or warranty claims traced back to a single lot. Both are specification problems, and both are preventable.

Specification
| Product | Fuel Tank Cap |
|---|---|
| Vehicle application | RAM 1500 |
| Material / finish | Chromed Steel |
| Typical use | Coastal Delivery |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Bulk lead time | 25-30 days after approval |
| Compliance | DOT |
| Packing | 50 pieces per inner box, 1000 per carton |
Material options
- Anodised Aluminium — the cost-effective default for volume programmes
- High Density Foam — the cost-effective default for volume programmes
- Forged Aluminium — selected when the part is exposed to weather and road salt
- Cast Iron — specified where the part sits close to a heat source
- Natural Rubber — specified where the part sits close to a heat source

Processes available
- sintering
- shot blasting
- powder coating
- rubber vulcanisation
- anodising
- precision stamping
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for coastal delivery. Related applications include track days, rental fleets, food delivery, motocross, night riding.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What testing is included?
Standard lots ship with dimensional and hardness reports. DOT documentation is issued with the shipment when your market requires it.
Ask for the current catalogue and the specification sheet for this line.







