Cabin Blower for Chery Tiggo: Silicone
This cabin blower for the Chery Tiggo is specified around silicone, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or documentation that arrived after the container shipped. Both are specification problems, and both are preventable.

Specification
| Product | Cabin Blower |
|---|---|
| Vehicle application | Chery Tiggo |
| Material / finish | Silicone |
| Typical use | Off-Road Trails |
| MOQ | 200 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 25-55 days after approval |
| Compliance | SAE J431 |
| Packing | 50 pieces per inner box, 200 per carton |
Material options
- Zinc Plated Steel — chosen where wear resistance comes first
- Chromed Steel — preferred when weight matters more than rigidity
- Carbon Fibre Composite — specified where the part sits close to a heat source
- Carbon Steel — specified where the part sits close to a heat source
- Ceramic Composite — the cost-effective default for volume programmes

Processes available
- CNC machining
- sintering
- injection moulding
- powder coating
- precision stamping
- assembly line testing
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Where it is used
The specification above is the one most often ordered for off-road trails. Related applications include long-distance touring, rural transport, airport ground fleets, ride-hailing fleets, night riding.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. SAE J431 documentation is issued with the shipment when your market requires it.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







