Thermostat for MG ZS: Nylon 66
This thermostat for the MG ZS is specified around nylon 66, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or warranty claims traced back to a single lot. Both are specification problems, and both are preventable.

Specification
| Product | Thermostat |
|---|---|
| Vehicle application | MG ZS |
| Material / finish | Nylon 66 |
| Typical use | Heavy Load Hauling |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 15-30 days after approval |
| Compliance | RoHS |
| Packing | 20 pieces per inner box, 200 per carton |
Material options
- Anodised Aluminium — chosen where wear resistance comes first
- Reinforced Nylon — used when the finish has to hold a coating
- Magnesium Alloy — specified where the part sits close to a heat source
- Neoprene — preferred when weight matters more than rigidity
- PU Leather — chosen where wear resistance comes first

Processes available
- cold forging
- assembly line testing
- ultrasonic cleaning
- sintering
- precision stamping
- robot welding
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for heavy load hauling. Related applications include adventure travel, airport ground fleets, farm use, ride-hailing fleets, construction sites.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 3 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Ask for the current catalogue and the specification sheet for this line.







