Pressure Plate for Mercedes-Benz G-Class: Aluminium Alloy
This pressure plate for the Mercedes-Benz G-Class is specified around aluminium alloy, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is packing that arrived crushed at the port, or lead time that slipped twice before bulk started. Both are specification problems, and both are preventable.

Specification
| Product | Pressure Plate |
|---|---|
| Vehicle application | Mercedes-Benz G-Class |
| Material / finish | Aluminium Alloy |
| Typical use | Mountain Roads |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 20-40 days after approval |
| Compliance | IATF 16949 |
| Packing | 50 pieces per inner box, 200 per carton |
Material options
- Powder Coated Steel — used when the finish has to hold a coating
- Titanium Alloy — preferred when weight matters more than rigidity
- Tempered Glass — the cost-effective default for volume programmes
- Anodised Aluminium — chosen where wear resistance comes first
- High Density Foam — preferred when weight matters more than rigidity

Processes available
- shot blasting
- gravity casting
- ultrasonic cleaning
- assembly line testing
- injection moulding
- CNC machining
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for mountain roads. Related applications include urban courier work, wet weather riding, motocross, rental fleets, rural transport.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







