Drive Shaft for Mazda CX-5: Sintered Metal
This drive shaft for the Mazda CX-5 is specified around sintered metal, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a fitment that looked right on paper and failed on the bench, or a supplier who changed material without saying so. Both are specification problems, and both are preventable.

Specification
| Product | Drive Shaft |
|---|---|
| Vehicle application | Mazda CX-5 |
| Material / finish | Sintered Metal |
| Typical use | Passenger Transport |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Bulk lead time | 15-55 days after approval |
| Compliance | RoHS |
| Packing | 100 pieces per inner box, 200 per carton |
Material options
- PVC Coated Fabric — chosen where wear resistance comes first
- PU Leather — selected when the part is exposed to weather and road salt
- Chromed Steel — specified where the part sits close to a heat source
- ABS Plastic — chosen where wear resistance comes first
- EPDM Rubber — the cost-effective default for volume programmes

Processes available
- powder coating
- surface grinding
- shot blasting
- injection moulding
- cold forging
- assembly line testing
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The specification above is the one most often ordered for passenger transport. Related applications include wet weather riding, motocross, rental fleets, urban courier work, mining sites.
Quality and packing
- In-line inspection with AQL 1.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Ask for the current catalogue and the specification sheet for this line.







