Welcome to Auto, Motorcycle Parts & Accessories official website!
Power Steering Pump for Honda Civic: Chromed Steel

Power Steering Pump for Honda Civic: Chromed Steel

Power Steering Pump for Honda Civic: Chromed SteelThis power steering pump for the Honda Civic is specified around chromed steel, which decides how it behaves in service far more than the part name.

Contact Number:
Product Details

Power Steering Pump for Honda Civic: Chromed Steel

This power steering pump for the Honda Civic is specified around chromed steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.

The usual reason a programme changes supplier is not unit price. It is a supplier who changed material without saying so, or packing that arrived crushed at the port. Both are specification problems, and both are preventable.

Honda Civic Power Steering Pump

Specification

ProductPower Steering Pump
Vehicle applicationHonda Civic
Material / finishChromed Steel
Typical useUrban Courier Work
MOQ3,000 pieces per specification
Sampling10 working days, 3 days per revision
Bulk lead time20-30 days after approval
ComplianceIATF 16949
Packing50 pieces per inner box, 200 per carton

Material options

  • ABS Plastic — specified where the part sits close to a heat source
  • Kevlar Composite — preferred when weight matters more than rigidity
  • Chromed Steel — the cost-effective default for volume programmes
  • Silicone — selected when the part is exposed to weather and road salt
  • PVC Coated Fabric — chosen where wear resistance comes first

Power Steering Pump detail

Processes available

  • die casting
  • heat treatment
  • ultrasonic cleaning
  • injection moulding
  • surface grinding
  • sintering

Fitment notes

Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.

Where it is used

The specification above is the one most often ordered for urban courier work. Related applications include security patrols, off-road trails, weekend riding, rural transport, roadside assistance.

Quality and packing

  • In-line inspection with AQL 1.5 sampling on every lot.
  • Dimensional report issued against the approved drawing.
  • Carton marking and barcode to your specification.
  • Golden sample retained at the factory as the reorder reference.

Questions buyers ask

What is the minimum order quantity?

The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top