Wheel Rim for Suzuki Jimny: Sintered Metal
This wheel rim for the Suzuki Jimny is specified around sintered metal, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is inconsistent hardness between lots, or a fitment that looked right on paper and failed on the bench. Both are specification problems, and both are preventable.

Specification
| Product | Wheel Rim |
|---|---|
| Vehicle application | Suzuki Jimny |
| Material / finish | Sintered Metal |
| Typical use | Rental Fleets |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 15-40 days after approval |
| Compliance | IATF 16949 |
| Packing | 100 pieces per inner box, 500 per carton |
Material options
- Stainless Steel — preferred when weight matters more than rigidity
- High Density Foam — chosen where wear resistance comes first
- ABS Plastic — chosen where wear resistance comes first
- Neoprene — selected when the part is exposed to weather and road salt
- Carbon Steel — specified where the part sits close to a heat source

Processes available
- cold forging
- precision stamping
- shot blasting
- CNC machining
- rubber vulcanisation
- assembly line testing
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for rental fleets. Related applications include urban courier work, mountain roads, rural transport, construction sites, delivery fleets.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







