Idle Control Valve for Geely Coolray: Magnesium Alloy
This idle control valve for the Geely Coolray is specified around magnesium alloy, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is warranty claims traced back to a single lot, or warranty claims traced back to a single lot. Both are specification problems, and both are preventable.

Specification
| Product | Idle Control Valve |
|---|---|
| Vehicle application | Geely Coolray |
| Material / finish | Magnesium Alloy |
| Typical use | Heavy Load Hauling |
| MOQ | 2,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 25-55 days after approval |
| Compliance | IATF 16949 |
| Packing | 50 pieces per inner box, 500 per carton |
Material options
- Powder Coated Steel — specified where the part sits close to a heat source
- Ceramic Composite — specified where the part sits close to a heat source
- Semi-Metallic Compound — used when the finish has to hold a coating
- Neoprene — selected when the part is exposed to weather and road salt
- Kevlar Composite — the cost-effective default for volume programmes

Processes available
- ultrasonic cleaning
- gravity casting
- assembly line testing
- laser cutting
- cold forging
- robot welding
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for heavy load hauling. Related applications include rural transport, mining sites, airport ground fleets, passenger transport, farm use.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.
What testing is included?
Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







