Throttle Body for Hyundai Tucson: Silicone
This throttle body for the Hyundai Tucson is specified around silicone, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a specification nobody had written down, or documentation that arrived after the container shipped. Both are specification problems, and both are preventable.

Specification
| Product | Throttle Body |
|---|---|
| Vehicle application | Hyundai Tucson |
| Material / finish | Silicone |
| Typical use | Night Riding |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Bulk lead time | 20-55 days after approval |
| Compliance | RoHS |
| Packing | 100 pieces per inner box, 1000 per carton |
Material options
- Carbon Steel — used when the finish has to hold a coating
- Powder Coated Steel — preferred when weight matters more than rigidity
- Kevlar Composite — used when the finish has to hold a coating
- Cast Iron — the cost-effective default for volume programmes
- Nylon 66 — preferred when weight matters more than rigidity

Processes available
- rubber vulcanisation
- die casting
- anodising
- powder coating
- shot blasting
- precision stamping
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for night riding. Related applications include ride-hailing fleets, track days, night riding, rural transport, delivery fleets.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Ask for the current catalogue and the specification sheet for this line.







