Transmission Cooler for Peugeot 3008: Ceramic Composite
This transmission cooler for the Peugeot 3008 is specified around ceramic composite, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is premature wear on the first batch, or a specification nobody had written down. Both are specification problems, and both are preventable.

Specification
| Product | Transmission Cooler |
|---|---|
| Vehicle application | Peugeot 3008 |
| Material / finish | Ceramic Composite |
| Typical use | Rural Transport |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 25-40 days after approval |
| Compliance | ISO/TS 16949 |
| Packing | 10 pieces per inner box, 1000 per carton |
Material options
- Polypropylene — preferred when weight matters more than rigidity
- Carbon Steel — chosen where wear resistance comes first
- Nylon 66 — used when the finish has to hold a coating
- Sintered Metal — specified where the part sits close to a heat source
- EPDM Rubber — preferred when weight matters more than rigidity

Processes available
- sintering
- rubber vulcanisation
- electroplating
- assembly line testing
- laser cutting
- gravity casting
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for rural transport. Related applications include heavy load hauling, food delivery, delivery fleets, night riding, coastal delivery.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Ask for the current catalogue and the specification sheet for this line.







