Serpentine Belt for Honda CR-V: Aluminium Alloy
This serpentine belt for the Honda CR-V is specified around aluminium alloy, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is a fitment that looked right on paper and failed on the bench, or inconsistent hardness between lots. Both are specification problems, and both are preventable.

Specification
| Product | Serpentine Belt |
|---|---|
| Vehicle application | Honda CR-V |
| Material / finish | Aluminium Alloy |
| Typical use | Roadside Assistance |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Bulk lead time | 20-55 days after approval |
| Compliance | ISO/TS 16949 |
| Packing | 20 pieces per inner box, 1000 per carton |
Material options
- Tempered Glass — the cost-effective default for volume programmes
- Ceramic Composite — the cost-effective default for volume programmes
- Zinc Plated Steel — used when the finish has to hold a coating
- Semi-Metallic Compound — chosen where wear resistance comes first
- Aluminium Alloy — used when the finish has to hold a coating

Processes available
- rubber vulcanisation
- shot blasting
- CNC machining
- laser cutting
- assembly line testing
- electroplating
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for roadside assistance. Related applications include rental fleets, security patrols, roadside assistance, weekend riding, mountain roads.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
What is the minimum order quantity?
The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







