MAP Sensor for Ford Everest: Chromed Steel
This map sensor for the Ford Everest is specified around chromed steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is documentation that arrived after the container shipped, or warranty claims traced back to a single lot. Both are specification problems, and both are preventable.

Specification
| Product | MAP Sensor |
|---|---|
| Vehicle application | Ford Everest |
| Material / finish | Chromed Steel |
| Typical use | Rural Transport |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 20-55 days after approval |
| Compliance | SGS |
| Packing | 50 pieces per inner box, 200 per carton |
Material options
- Titanium Alloy — the cost-effective default for volume programmes
- PU Leather — preferred when weight matters more than rigidity
- Sintered Metal — used when the finish has to hold a coating
- Silicone — used when the finish has to hold a coating
- PVC Coated Fabric — selected when the part is exposed to weather and road salt

Processes available
- robot welding
- precision stamping
- powder coating
- surface grinding
- die casting
- injection moulding
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Where it is used
The specification above is the one most often ordered for rural transport. Related applications include passenger transport, mining sites, mountain roads, coastal delivery, wet weather riding.
Quality and packing
- In-line inspection with AQL 4.0 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







