Starter Motor for Ford Everest: Powder Coated Steel
This starter motor for the Ford Everest is specified around powder coated steel, which decides how it behaves in service far more than the part name does. We build to a written specification — base material, dimensions, finish and packing — and hold that specification on file so every reorder reproduces the approved piece.
The usual reason a programme changes supplier is not unit price. It is packing that arrived crushed at the port, or premature wear on the first batch. Both are specification problems, and both are preventable.

Specification
| Product | Starter Motor |
|---|---|
| Vehicle application | Ford Everest |
| Material / finish | Powder Coated Steel |
| Typical use | Ride-Hailing Fleets |
| MOQ | 200 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Bulk lead time | 20-40 days after approval |
| Compliance | SAE J431 |
| Packing | 10 pieces per inner box, 200 per carton |
Material options
- Cast Iron — the cost-effective default for volume programmes
- PVC Coated Fabric — preferred when weight matters more than rigidity
- Polypropylene — specified where the part sits close to a heat source
- Tempered Glass — chosen where wear resistance comes first
- ABS Plastic — selected when the part is exposed to weather and road salt

Processes available
- assembly line testing
- heat treatment
- anodising
- surface grinding
- gravity casting
- sintering
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Where it is used
The specification above is the one most often ordered for ride-hailing fleets. Related applications include rental fleets, wet weather riding, motocross, night riding, off-road trails.
Quality and packing
- In-line inspection with AQL 2.5 sampling on every lot.
- Dimensional report issued against the approved drawing.
- Carton marking and barcode to your specification.
- Golden sample retained at the factory as the reorder reference.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Ask for the current catalogue and the specification sheet for this line.







