Tyre Pressure Monitor for Haval H6 — Maintenance Schedule
Tyre Pressure Monitor on the Haval H6 is one of the few items where the specification is not a matter of taste. This maintenance schedule covers what has to be checked before the part is bought, what the installation actually involves, and what has to be documented for the vehicle to stay insurable and road legal in your market.
Failures here are rarely dramatic. They are inconsistent hardness between lots, or a supplier who changed material without saying so — the kind of problem that shows up at the worst possible moment.

Specification
| Item | Tyre Pressure Monitor |
|---|---|
| Vehicle application | Haval H6 |
| Focus | Maintenance Schedule |
| Base material | Titanium Alloy |
| MOQ | 1,000 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | REACH |
What to check before buying
- Fitment — confirm the model year and market version of the Haval H6 before ordering.
- Compliance — REACH documentation should be issued with the shipment, not after it.
- Material — Titanium Alloy is the base; substitution is a new approval, not a small change.
- Installation — check whether the vehicle wiring or trim has to come out first.
- Documentation — keep the test report with the vehicle record.

Installation notes
- Disconnect the battery before any wiring work.
- Route cables away from moving parts and heat sources.
- Test the function before the trim goes back on.
- Record the installation date and the part number in the vehicle file.
- Re-check after the first week of use.
Maintenance and inspection
- Visual check every service interval.
- Function test after any electrical work on the vehicle.
- Replace at the first sign of intermittent operation.
- Keep the approved sample part number on the maintenance record.
Related safety items
Programmes that specify tyre pressure monitor usually cover car radar, safety hammer, car black box, reverse radar at the same time.
Questions buyers ask
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.
What testing is included?
Standard lots ship with dimensional and hardness reports. REACH documentation is issued with the shipment when your market requires it.
Send the specification you are working to and we will confirm what we can match, what we would change and why.






