Speed Bump for Chery Tiggo — Maintenance Schedule
Speed Bump on the Chery Tiggo is one of the few items where the specification is not a matter of taste. This maintenance schedule covers what has to be checked before the part is bought, what the installation actually involves, and what has to be documented for the vehicle to stay insurable and road legal in your market.
Failures here are rarely dramatic. They are a fitment that looked right on paper and failed on the bench, or premature wear on the first batch — the kind of problem that shows up at the worst possible moment.

Specification
| Item | Speed Bump |
|---|---|
| Vehicle application | Chery Tiggo |
| Focus | Maintenance Schedule |
| Base material | Anodised Aluminium |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 3 days per revision |
| Compliance | IATF 16949 |
What to check before buying
- Fitment — confirm the model year and market version of the Chery Tiggo before ordering.
- Compliance — IATF 16949 documentation should be issued with the shipment, not after it.
- Material — Anodised Aluminium is the base; substitution is a new approval, not a small change.
- Installation — check whether the vehicle wiring or trim has to come out first.
- Documentation — keep the test report with the vehicle record.

Installation notes
- Disconnect the battery before any wiring work.
- Route cables away from moving parts and heat sources.
- Test the function before the trim goes back on.
- Record the installation date and the part number in the vehicle file.
- Re-check after the first week of use.
Maintenance and inspection
- Visual check every service interval.
- Function test after any electrical work on the vehicle.
- Replace at the first sign of intermittent operation.
- Keep the approved sample part number on the maintenance record.
Related safety items
Programmes that specify speed bump usually cover roof light bar, road cone, blind spot monitor, safety hammer at the same time.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Send the specification you are working to and we will confirm what we can match, what we would change and why.






