Seat Belt Kit for JAC T6 — Maintenance Schedule
Seat Belt Kit on the JAC T6 is one of the few items where the specification is not a matter of taste. This maintenance schedule covers what has to be checked before the part is bought, what the installation actually involves, and what has to be documented for the vehicle to stay insurable and road legal in your market.
Failures here are rarely dramatic. They are premature wear on the first batch, or a fitment that looked right on paper and failed on the bench — the kind of problem that shows up at the worst possible moment.

Specification
| Item | Seat Belt Kit |
|---|---|
| Vehicle application | JAC T6 |
| Focus | Maintenance Schedule |
| Base material | Forged Aluminium |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | ECE R90 |
What to check before buying
- Fitment — confirm the model year and market version of the JAC T6 before ordering.
- Compliance — ECE R90 documentation should be issued with the shipment, not after it.
- Material — Forged Aluminium is the base; substitution is a new approval, not a small change.
- Installation — check whether the vehicle wiring or trim has to come out first.
- Documentation — keep the test report with the vehicle record.

Installation notes
- Disconnect the battery before any wiring work.
- Route cables away from moving parts and heat sources.
- Test the function before the trim goes back on.
- Record the installation date and the part number in the vehicle file.
- Re-check after the first week of use.
Maintenance and inspection
- Visual check every service interval.
- Function test after any electrical work on the vehicle.
- Replace at the first sign of intermittent operation.
- Keep the approved sample part number on the maintenance record.
Related safety items
Programmes that specify seat belt kit usually cover seat belt buckle, dash cam, rear view mirror, road cone at the same time.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







