Seat Belt Kit for Geely Coolray — Fitment Guide
Seat Belt Kit on the Geely Coolray is one of the few items where the specification is not a matter of taste. This fitment guide covers what has to be checked before the part is bought, what the installation actually involves, and what has to be documented for the vehicle to stay insurable and road legal in your market.
Failures here are rarely dramatic. They are a fitment that looked right on paper and failed on the bench, or warranty claims traced back to a single lot — the kind of problem that shows up at the worst possible moment.

Specification
| Item | Seat Belt Kit |
|---|---|
| Vehicle application | Geely Coolray |
| Focus | Fitment Guide |
| Base material | Zinc Plated Steel |
| MOQ | 500 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | ECE R90 |
What to check before buying
- Fitment — confirm the model year and market version of the Geely Coolray before ordering.
- Compliance — ECE R90 documentation should be issued with the shipment, not after it.
- Material — Zinc Plated Steel is the base; substitution is a new approval, not a small change.
- Installation — check whether the vehicle wiring or trim has to come out first.
- Documentation — keep the test report with the vehicle record.

Installation notes
- Disconnect the battery before any wiring work.
- Route cables away from moving parts and heat sources.
- Test the function before the trim goes back on.
- Record the installation date and the part number in the vehicle file.
- Re-check after the first week of use.
Maintenance and inspection
- Visual check every service interval.
- Function test after any electrical work on the vehicle.
- Replace at the first sign of intermittent operation.
- Keep the approved sample part number on the maintenance record.
Related safety items
Programmes that specify seat belt kit usually cover led warning light, airbag control module, safety hammer, dash cam at the same time.
Questions buyers ask
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







