Tyre Pressure Monitor for Audi Q5 — Compliance Checklist
Tyre Pressure Monitor on the Audi Q5 is one of the few items where the specification is not a matter of taste. This compliance checklist covers what has to be checked before the part is bought, what the installation actually involves, and what has to be documented for the vehicle to stay insurable and road legal in your market.
Failures here are rarely dramatic. They are reorders that did not match the approved sample, or documentation that arrived after the container shipped — the kind of problem that shows up at the worst possible moment.

Specification
| Item | Tyre Pressure Monitor |
|---|---|
| Vehicle application | Audi Q5 |
| Focus | Compliance Checklist |
| Base material | Nylon 66 |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 5 days per revision |
| Compliance | RoHS |
What to check before buying
- Fitment — confirm the model year and market version of the Audi Q5 before ordering.
- Compliance — RoHS documentation should be issued with the shipment, not after it.
- Material — Nylon 66 is the base; substitution is a new approval, not a small change.
- Installation — check whether the vehicle wiring or trim has to come out first.
- Documentation — keep the test report with the vehicle record.

Installation notes
- Disconnect the battery before any wiring work.
- Route cables away from moving parts and heat sources.
- Test the function before the trim goes back on.
- Record the installation date and the part number in the vehicle file.
- Re-check after the first week of use.
Maintenance and inspection
- Visual check every service interval.
- Function test after any electrical work on the vehicle.
- Replace at the first sign of intermittent operation.
- Keep the approved sample part number on the maintenance record.
Related safety items
Programmes that specify tyre pressure monitor usually cover car black box, dash cam, seat belt buckle, car alarm at the same time.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. RoHS documentation is issued with the shipment when your market requires it.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the RoHS-compliant build instead of a fresh interpretation.
Tell us the model, the fitment and the quantity and we will hold a production slot for you.







