Welcome to Auto, Motorcycle Parts & Accessories official website!

Engine Assembly Specification Example for Assembly Programmes: Long Life Version

Source:Replacement Windshields / Time:2026-09-18

Engine Assembly Specification Example for Assembly Programmes: Long Life Version

This is a worked specification for engine assembly in a long life version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The long life version version exists because the duty cycle on assembly programmes is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually documentation that arrived after the container shipped.

Engine Assembly

Example specification

ItemEngine Assembly
ApplicationAssembly Programmes
VersionLong Life Version
Base materialCarbon Steel
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishanodised
MOQ1,000 pieces per specification
Sampling7 working days, 3 days per revision
ComplianceECE R90

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Carbon Steel, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Engine Assembly example

Processes involved

  • sintering
  • ultrasonic cleaning
  • die casting
  • rubber vulcanisation
  • CNC machining
  • heat treatment

Where this example applies

Programmes that run long life version most often specify this build for assembly programmes. Related applications include boat trailers, racing teams, three-wheelers, light trucks, workshop replacements.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 1000 pieces per line.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top