Integrated Bumper Specification Example for Dealership Service: Budget Line
Integrated Bumper Specification Example for Dealership Service: Budget Line
This is a worked specification for integrated bumper in a budget line programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The budget line version exists because the duty cycle on dealership service is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a fitment that looked right on paper and failed on the bench.

Example specification
| Item | Integrated Bumper |
|---|---|
| Application | Dealership Service |
| Version | Budget Line |
| Base material | Natural Rubber |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.05 mm |
| Finish | as machined |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | TUV |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Natural Rubber, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- precision stamping
- laser cutting
- shot blasting
- die casting
- surface grinding
- assembly line testing
Where this example applies
Programmes that run budget line most often specify this build for dealership service. Related applications include dealership service, fleet maintenance, camper conversions, construction equipment, courier fleets.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 1.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
What testing is included?
Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the TUV-compliant build instead of a fresh interpretation.
Ask for the current catalogue and the specification sheet for this line.



