Welcome to Auto, Motorcycle Parts & Accessories official website!

Otr Tire Tools Specification Example for Fleet Maintenance: OEM Replacement

Source:Off-Road LED Bar / Time:2026-09-18

Otr Tire Tools Specification Example for Fleet Maintenance: OEM Replacement

This is a worked specification for otr tire tools in a oem replacement programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The oem replacement version exists because the duty cycle on fleet maintenance is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a fitment that looked right on paper and failed on the bench.

Otr Tire Tools

Example specification

ItemOtr Tire Tools
ApplicationFleet Maintenance
VersionOEM Replacement
Base materialForged Aluminium
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishzinc plated
MOQ3,000 pieces per specification
Sampling7 working days, 5 days per revision
ComplianceISO/TS 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Forged Aluminium, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Otr Tire Tools example

Processes involved

  • robot welding
  • surface grinding
  • cold forging
  • powder coating
  • die casting
  • electroplating

Where this example applies

Programmes that run oem replacement most often specify this build for fleet maintenance. Related applications include boat trailers, dealership service, construction equipment, courier fleets, scooter fleets.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

What is the minimum order quantity?

The standard MOQ is 3000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top