Welcome to Auto, Motorcycle Parts & Accessories official website!

Heat Rejection Tint Specification Example for Fleet Maintenance: OEM Replacement

Source:Off-Road LED Bar / Time:2026-09-18

Heat Rejection Tint Specification Example for Fleet Maintenance: OEM Replacement

This is a worked specification for heat rejection tint in a oem replacement programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The oem replacement version exists because the duty cycle on fleet maintenance is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually lead time that slipped twice before bulk started.

Heat Rejection Tint

Example specification

ItemHeat Rejection Tint
ApplicationFleet Maintenance
VersionOEM Replacement
Base materialABS Plastic
Controlled dimensions3 key dimensions, recorded per lot
Tolerance band±0.2 mm
Finishzinc plated
MOQ2,000 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceISO 9001

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — ABS Plastic, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Heat Rejection Tint example

Processes involved

  • heat treatment
  • anodising
  • shot blasting
  • die casting
  • CNC machining
  • precision stamping

Where this example applies

Programmes that run oem replacement most often specify this build for fleet maintenance. Related applications include long-haul trucks, rental motorcycles, three-wheelers, light trucks, courier fleets.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top