Car Sun Rain Guard Specification Example for Camper Conversions: Fixed Type
Car Sun Rain Guard Specification Example for Camper Conversions: Fixed Type
This is a worked specification for car sun rain guard in a fixed type programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The fixed type version exists because the duty cycle on camper conversions is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually lead time that slipped twice before bulk started.

Example specification
| Item | Car Sun Rain Guard |
|---|---|
| Application | Camper Conversions |
| Version | Fixed Type |
| Base material | Natural Rubber |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | anodised |
| MOQ | 3,000 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | ISO/TS 16949 |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Natural Rubber, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- sintering
- injection moulding
- die casting
- ultrasonic cleaning
- precision stamping
- heat treatment
Where this example applies
Programmes that run fixed type most often specify this build for camper conversions. Related applications include three-wheelers, city buses, assembly programmes, agricultural trailers, utility trailers.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. ISO/TS 16949 documentation is issued with the shipment when your market requires it.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Ask for the current catalogue and the specification sheet for this line.



