Forged Rim Specification Example for Delivery Vans: Upgraded Version
Forged Rim Specification Example for Delivery Vans: Upgraded Version
This is a worked specification for forged rim in a upgraded version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The upgraded version version exists because the duty cycle on delivery vans is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a specification nobody had written down.

Example specification
| Item | Forged Rim |
|---|---|
| Application | Delivery Vans |
| Version | Upgraded Version |
| Base material | ABS Plastic |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.1 mm |
| Finish | zinc plated |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | CCC |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — ABS Plastic, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- gravity casting
- laser cutting
- injection moulding
- CNC machining
- robot welding
- anodising
Where this example applies
Programmes that run upgraded version most often specify this build for delivery vans. Related applications include courier fleets, rental motorcycles, construction equipment, delivery vans, city buses.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 1.5 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 3 days once you have seen the first piece.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
What testing is included?
Standard lots ship with dimensional and hardness reports. CCC documentation is issued with the shipment when your market requires it.
Ask for the current catalogue and the specification sheet for this line.



