Welcome to Auto, Motorcycle Parts & Accessories official website!

Engine Starter System Specification Example for Scooter Fleets: Heavy Duty

Source:Anti Theft Lock / Time:2026-09-18

Engine Starter System Specification Example for Scooter Fleets: Heavy Duty

This is a worked specification for engine starter system in a heavy duty programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The heavy duty version exists because the duty cycle on scooter fleets is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually packing that arrived crushed at the port.

Engine Starter System

Example specification

ItemEngine Starter System
ApplicationScooter Fleets
VersionHeavy Duty
Base materialTempered Glass
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.05 mm
Finishanodised
MOQ3,000 pieces per specification
Sampling14 working days, 5 days per revision
ComplianceIATF 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Tempered Glass, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Engine Starter System example

Processes involved

  • surface grinding
  • robot welding
  • anodising
  • assembly line testing
  • laser cutting
  • electroplating

Where this example applies

Programmes that run heavy duty most often specify this build for scooter fleets. Related applications include assembly programmes, agricultural trailers, light trucks, rental motorcycles, construction equipment.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

How long does sampling take?

Samples leave the factory in 14 working days, and each revision round adds about 5 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.

How is packing specified?

Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.

Tell us the model, the fitment and the quantity and we will hold a production slot for you.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top