Electric Motor Speed Controller Specification Example for Scooter Fleets: Two-Piece Construction

Source:Electric Power Steering System / Time:2026-09-18

Electric Motor Speed Controller Specification Example for Scooter Fleets: Two-Piece Construction

This is a worked specification for electric motor speed controller in a two-piece construction programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The two-piece construction version exists because the duty cycle on scooter fleets is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually a supplier who changed material without saying so.

Electric Motor Speed Controller

Example specification

ItemElectric Motor Speed Controller
ApplicationScooter Fleets
VersionTwo-Piece Construction
Base materialPU Leather
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.5 mm
Finishzinc plated
MOQ2,000 pieces per specification
Sampling7 working days, 5 days per revision
ComplianceE-mark

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — PU Leather, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Electric Motor Speed Controller example

Processes involved

  • precision stamping
  • gravity casting
  • robot welding
  • ultrasonic cleaning
  • heat treatment
  • injection moulding

Where this example applies

Programmes that run two-piece construction most often specify this build for scooter fleets. Related applications include assembly programmes, rental motorcycles, export programmes, fleet maintenance, boat trailers.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 2.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What happens if a lot fails inspection?

The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

What testing is included?

Standard lots ship with dimensional and hardness reports. E-mark documentation is issued with the shipment when your market requires it.

How long does sampling take?

Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.

Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top