Otr Tire Tools Specification Example for Construction Equipment: Low Maintenance Version
Otr Tire Tools Specification Example for Construction Equipment: Low Maintenance Version
This is a worked specification for otr tire tools in a low maintenance version programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.
The low maintenance version version exists because the duty cycle on construction equipment is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually reorders that did not match the approved sample.

Example specification
| Item | Otr Tire Tools |
|---|---|
| Application | Construction Equipment |
| Version | Low Maintenance Version |
| Base material | Stainless Steel |
| Controlled dimensions | 6 key dimensions, recorded per lot |
| Tolerance band | ±0.2 mm |
| Finish | anodised |
| MOQ | 200 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | SGS |
How the example is built up
- Start from the duty cycle, not from the catalogue photograph.
- Fix the base material in writing — Stainless Steel, in this example.
- List the dimensions that are actually controlled and the tolerance on each.
- Name the finish and what it has to survive.
- State the inspection level and who pays when a lot fails.

Processes involved
- gravity casting
- sintering
- shot blasting
- anodising
- precision stamping
- surface grinding
Where this example applies
Programmes that run low maintenance version most often specify this build for construction equipment. Related applications include utility trailers, boat trailers, trailer axles, light trucks, workshop replacements.
Checks before packing
- Dimensional report against the approved drawing.
- AQL 4.0 sampling on the finished lot.
- Finish inspection under agreed lighting.
- Carton drop test on the first lot of a new packing specification.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. SGS documentation is issued with the shipment when your market requires it.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the SGS-compliant build instead of a fresh interpretation.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 200 pieces per line.
What is the minimum order quantity?
The standard MOQ is 200 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Ask for the current catalogue and the specification sheet for this line.



