Welcome to Auto, Motorcycle Parts & Accessories official website!

Otr Tire Tools Specification Example for Agricultural Trailers: OEM Replacement

Source:Commercial AC Charging Station / Time:2026-09-18

Otr Tire Tools Specification Example for Agricultural Trailers: OEM Replacement

This is a worked specification for otr tire tools in a oem replacement programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The oem replacement version exists because the duty cycle on agricultural trailers is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually premature wear on the first batch.

Otr Tire Tools

Example specification

ItemOtr Tire Tools
ApplicationAgricultural Trailers
VersionOEM Replacement
Base materialTitanium Alloy
Controlled dimensions4 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishpainted
MOQ2,000 pieces per specification
Sampling10 working days, 5 days per revision
ComplianceIATF 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Titanium Alloy, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

Otr Tire Tools example

Processes involved

  • anodising
  • electroplating
  • die casting
  • laser cutting
  • injection moulding
  • robot welding

Where this example applies

Programmes that run oem replacement most often specify this build for agricultural trailers. Related applications include aftermarket retail, emergency vehicles, workshop replacements, municipal fleets, construction equipment.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 1.5 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

What testing is included?

Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.

Can the specification be held on file?

Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the IATF 16949-compliant build instead of a fresh interpretation.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top