Welcome to Auto, Motorcycle Parts & Accessories official website!

63 Inch Titan Tire Specification Example for Aftermarket Retail: Reinforced Build

Source:Commercial AC Charging Station / Time:2026-09-18

63 Inch Titan Tire Specification Example for Aftermarket Retail: Reinforced Build

This is a worked specification for 63 inch titan tire in a reinforced build programme. It is the document we would send a buyer who asks what exactly they are getting: the material, the dimensions that are actually controlled, the finish, and the checks that happen before anything is packed.

The reinforced build version exists because the duty cycle on aftermarket retail is not the same as on a showroom vehicle. Where the two are specified identically, something fails later — usually warranty claims traced back to a single lot.

63 Inch Titan Tire

Example specification

Item63 Inch Titan Tire
ApplicationAftermarket Retail
VersionReinforced Build
Base materialSintered Metal
Controlled dimensions6 key dimensions, recorded per lot
Tolerance band±0.1 mm
Finishzinc plated
MOQ500 pieces per specification
Sampling10 working days, 5 days per revision
ComplianceIATF 16949

How the example is built up

  1. Start from the duty cycle, not from the catalogue photograph.
  2. Fix the base material in writing — Sintered Metal, in this example.
  3. List the dimensions that are actually controlled and the tolerance on each.
  4. Name the finish and what it has to survive.
  5. State the inspection level and who pays when a lot fails.

63 Inch Titan Tire example

Processes involved

  • ultrasonic cleaning
  • cold forging
  • assembly line testing
  • precision stamping
  • surface grinding
  • CNC machining

Where this example applies

Programmes that run reinforced build most often specify this build for aftermarket retail. Related applications include city buses, rental motorcycles, delivery vans, utility trailers, passenger cars.

Checks before packing

  • Dimensional report against the approved drawing.
  • AQL 4.0 sampling on the finished lot.
  • Finish inspection under agreed lighting.
  • Carton drop test on the first lot of a new packing specification.

Questions buyers ask

Do you handle mixed containers?

Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.

Can you match an existing sample?

Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.

How long does sampling take?

Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.

What testing is included?

Standard lots ship with dimensional and hardness reports. IATF 16949 documentation is issued with the shipment when your market requires it.

Ask for the current catalogue and the specification sheet for this line.

Online customer service
WeChat contact
Customer service
Scan code to add Wechat (same mobile phone number)
Telephone consultation
Back to top