Product Details
- Overview
- Product Description
- Specification
Basic Info.
Model NO.
VPB-E800
Type
Spray Booth
Certification
CE
Substrate
Steel
Brand
Vico
Coating
Powder Coating
Airflow Direction
Downdraft
Heating Mode
Electric
Paint Mist Treatment
Dry-type
Condition
New
Inner Dimension
6900 L*3900 W*2650 H
Front Main Door
3000W*2600h
No Load Speed
0.37 M/S
Blower Capacity
25000 M3/H
Power
49 Kw
Centrifugal Fans
2 Sets
Lighting System
8 Unit Box
Transport Package
Standard Export Package or as Customer Require
Specification
7000 L*5200 W*3370 H
Trademark
Vico or customization
Origin
China
HS Code
8417809090
Production Capacity
100/Month
Packaging & Delivery
Package Size
598.00cm * 235.00cm * 238.00cm
Package Gross Weight
4000.000kg
Product Description
|
Product Name
|
Vehicle Paint Spray Booth #VPB-E800
|
|
Booth type
|
Full electric painting and baking/ down draft booth, Luxurious and Highly Efficient
|
|
Outer dimension (mm)
|
7000L*5200W*3370H
|
|
Inner dimension(mm)
|
6900L*3900W*2650H
|
|
Door dimension(mm)
|
Front main door 3000W*2600H, side small door 680W*1800H Manal made steel stainless main door, with 4 pcs big clear tempered glass, double folded 8mm thickness, good performance and strong. The door frame made of 1.2mm titanium alloy material; 3 units hinge make sure door stable. Each door side covered with high quality rubber, booth room sealed well. |
|
Heating system
|
By 10 sets of high-quality infrared lights, each set 3 pieces,1.0kw, and total baking power:30kw. Unit box embedded into the wall panel.
Thickness 2.5m2,500ºC wire, covered with 40*80mm cable tray.
|
|
Wall material
|
50mm fire proof rock wool wall panel board, steel thickness:0.426mm, Socket type assembling.
|
|
Roof material
|
0.8mm galvanized steel sheet.
|
|
Basement
|
The whole basement is made of galvanized steel, top of basement is 2 rows of grilles and 3 rows of diamond plate. All the materials are antiseptic and durable.
|
|
Ramps
|
Two pieces of 280*1800mm ramps.
|
|
Lighting system
|
Using LED lamps, energy efficiency and longer life time than ordinary light. With 45°installation at ceiling, 8 Unit box, 3x16W, ≥800Lux |
|
Air intake system
|
2 sets centrifugal fans,4 KW/set, total air volume:25000m³/h; side draft and the air speed 0.37m/s; air changes:260times/h. Galvanized steel structure and covered by steel board. |
|
Air exhaust system
|
1x5.5KW motor blower, centrifugal fan, air volume: 15000m³/h.
|
|
Control system
|
Switch control: lighting, painting, baking, temperature setting, time setting, urgent stop. Size: 500*700mm
|
|
Filter system
|
Primary filtration: high grade fiberglass filter dust ≥10um in the inlet; secondary filtration: EU5CC-600G filters filter the dust ≥5um in the roof. TSP value≤1.4mg/m³.
|
|
Waste gas treatment
|
(Optional)Primary treatment: under basement filters; secondary treatment: activated carbon filters in the exhaust port.
|
|
Exhaust chimney
|
3 straight tubes,1 elbow tube.
|
|
Available colors
|
Blue, Orange, red, grey white
|

1 Q : Are you Manufacture or trading company?
A : We are professional and have factory with our own export department. All clients are welcomed to visit us.
2 Q : How about the quality of your products ?and why choose Vico?
A : With advanced manufacturing machines ,Choose top raw materials from the finest plants; Low prier with high quality revenue producing products; The best customer service. Quick reply within 12 hours;18 months or 3 Year's Warranty!
3 Q : What's the Minimum Quantity Order?
A : We accept one piece/set each time
4 Q : Can we customize our products?
A : Yes ,you can .Customized material ,size ,lift capacity ,color are acceptable. We can provide different standards to your market and favor.
5 Q : How do i make the order and pay?
A : You can choose Made in China trade assurance online deal or by TT bank transfer according to the Proforma invoice (PI)/Contract. Deposit 30% or 50% for production, balance paid before delivery.
6 Q : After payment how long will you arrange the delivery ? If o don't have ship agent, can you arrange the shipment?
A : Delivery usually will be arranged in 10~20 days after your payment ,sales will confirm with you before setting the deal. We can offer FOB to China sea port, CNF to customer's country sea port, also can arrange the DDU or DDP to door address shipment service.

![[Hot Item] Vico Car Spray Booth Oven CE Approved Auto Paint Baking Room](http://image.made-in-china.com/2f0j00dJsVUhfZEEpC/Vico-Car-Spray-Booth-Oven-CE-Approved-Auto-Paint-Baking-Room.webp)



