Car Refrigerator for Subaru Forester: Mining Sites
This car refrigerator is the version most often ordered for mining sites on the Subaru Forester. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: reorders that did not match the approved sample, or a supplier who changed material without saying so. Both come from a specification that was never written down.

Specification
| Product | Car Refrigerator |
|---|---|
| Vehicle application | Subaru Forester |
| Intended use | Mining Sites |
| Base material | Cast Iron |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | TUV |
Why this version
- Material — Cast Iron, chosen for the mining sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Subaru Forester without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Utility Trailer Kit
- Cargo Net
- Snow Chain
- Car Vacuum Cleaner
- Car Antenna
- Tow Rope
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; mining sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 2000 pieces per line.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the TUV-compliant build instead of a fresh interpretation.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







