Car Air Purifier for Mercedes-Benz G-Class: Off-Road Trails
This car air purifier is the version most often ordered for off-road trails on the Mercedes-Benz G-Class. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: warranty claims traced back to a single lot, or warranty claims traced back to a single lot. Both come from a specification that was never written down.

Specification
| Product | Car Air Purifier |
|---|---|
| Vehicle application | Mercedes-Benz G-Class |
| Intended use | Off-Road Trails |
| Base material | Zinc Plated Steel |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 3 days per revision |
| Compliance | TUV |
Why this version
- Material — Zinc Plated Steel, chosen for the off-road trails duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Mercedes-Benz G-Class without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Phone Holder
- Tricycle Parts Set
- Trim Clip Set
- Parking Barrier
- Wiper Blade Set
- Cable Tie Set
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; off-road trails is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. TUV documentation is issued with the shipment when your market requires it.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







