Parking Barrier for Isuzu D-Max: Heavy Load Hauling
This parking barrier is the version most often ordered for heavy load hauling on the Isuzu D-Max. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: packing that arrived crushed at the port, or lead time that slipped twice before bulk started. Both come from a specification that was never written down.

Specification
| Product | Parking Barrier |
|---|---|
| Vehicle application | Isuzu D-Max |
| Intended use | Heavy Load Hauling |
| Base material | Forged Aluminium |
| MOQ | 500 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | ECE R90 |
Why this version
- Material — Forged Aluminium, chosen for the heavy load hauling duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Isuzu D-Max without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Trim Clip Set
- Air Freshener
- Cargo Carrier
- Car Refrigerator
- Car Fan
- Bus Parts Set
Fitment notes
Keep the old part until the new one is on the bench. Comparing them side by side settles questions a photograph never will.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; heavy load hauling is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.







