Parking Lock for Dodge Ram: Weekend Riding
This parking lock is the version most often ordered for weekend riding on the Dodge Ram. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: documentation that arrived after the container shipped, or documentation that arrived after the container shipped. Both come from a specification that was never written down.

Specification
| Product | Parking Lock |
|---|---|
| Vehicle application | Dodge Ram |
| Intended use | Weekend Riding |
| Base material | Stainless Steel |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | REACH |
Why this version
- Material — Stainless Steel, chosen for the weekend riding duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Dodge Ram without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Trim Clip Set
- Steering Cover
- Wheel Stop
- Floor Mat
- Trailer Hitch
- Loading Ramp
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; weekend riding is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the REACH-compliant build instead of a fresh interpretation.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 500 pieces per line.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







