Parking Barrier for Mazda BT-50: Mining Sites
This parking barrier is the version most often ordered for mining sites on the Mazda BT-50. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: inconsistent hardness between lots, or warranty claims traced back to a single lot. Both come from a specification that was never written down.
![]()
Specification
| Product | Parking Barrier |
|---|---|
| Vehicle application | Mazda BT-50 |
| Intended use | Mining Sites |
| Base material | Bronze |
| MOQ | 2,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | ECE R90 |
Why this version
- Material — Bronze, chosen for the mining sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Mazda BT-50 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Trailer Hitch
- Tow Rope
- Parking Lock
- Trim Clip Set
- Car Vacuum Cleaner
- Headlight Bulb Kit
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; mining sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ECE R90-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
What is the minimum order quantity?
The standard MOQ is 2000 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
What testing is included?
Standard lots ship with dimensional and hardness reports. ECE R90 documentation is issued with the shipment when your market requires it.
Send the part number, the annual volume and the target market, and we will come back with a specification and a sampling plan.







