Trim Clip Set for Jeep Wrangler: Construction Sites
This trim clip set is the version most often ordered for construction sites on the Jeep Wrangler. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: a specification nobody had written down, or a supplier who changed material without saying so. Both come from a specification that was never written down.

Specification
| Product | Trim Clip Set |
|---|---|
| Vehicle application | Jeep Wrangler |
| Intended use | Construction Sites |
| Base material | Kevlar Composite |
| MOQ | 3,000 pieces per specification |
| Sampling | 14 working days, 3 days per revision |
| Compliance | ISO/TS 16949 |
Why this version
- Material — Kevlar Composite, chosen for the construction sites duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Jeep Wrangler without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Car Rice Cooker
- Secondhand Vehicle Stock
- Car Vacuum Cleaner
- Phone Holder
- Loading Ramp
- Cargo Carrier
Fitment notes
Check whether the mounting points on your market version match the catalogue drawing — regional variants are the usual cause of a wrong first order.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; construction sites is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
How long does sampling take?
Samples leave the factory in 14 working days, and each revision round adds about 3 days once you have seen the first piece.
Do you handle mixed containers?
Yes. Most programmes consolidate several part numbers into one container to keep freight sensible at 3000 pieces per line.
What happens if a lot fails inspection?
The lot is re-inspected against the golden sample, and replacement pieces ship on the next available booking at our cost.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the ISO/TS 16949-compliant build instead of a fresh interpretation.
Send the specification you are working to and we will confirm what we can match, what we would change and why.







