Snow Chain for Nissan X-Trail: Mountain Roads
This snow chain is the version most often ordered for mountain roads on the Nissan X-Trail. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: premature wear on the first batch, or documentation that arrived after the container shipped. Both come from a specification that was never written down.

Specification
| Product | Snow Chain |
|---|---|
| Vehicle application | Nissan X-Trail |
| Intended use | Mountain Roads |
| Base material | Bronze |
| MOQ | 1,000 pieces per specification |
| Sampling | 7 working days, 5 days per revision |
| Compliance | SAE J431 |
Why this version
- Material — Bronze, chosen for the mountain roads duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Nissan X-Trail without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Work Lamp
- Tricycle Parts Set
- Trim Clip Set
- Parking Barrier
- Cable Tie Set
- Roof Box
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; mountain roads is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What testing is included?
Standard lots ship with dimensional and hardness reports. SAE J431 documentation is issued with the shipment when your market requires it.
How is packing specified?
Individual packing, inner box quantity and carton marking are confirmed at quotation stage so the cartons arrive ready for your warehouse.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
How long does sampling take?
Samples leave the factory in 7 working days, and each revision round adds about 5 days once you have seen the first piece.
Ask for the current catalogue and the specification sheet for this line.







