Utility Trailer Kit for Changan CS75: Track Days
This utility trailer kit is the version most often ordered for track days on the Changan CS75. It is supplied to a written specification covering material, dimensions, finish and packing, and that specification stays on file — so a repeat order is a reorder, not a new negotiation.
What usually goes wrong is ordinary: premature wear on the first batch, or lead time that slipped twice before bulk started. Both come from a specification that was never written down.

Specification
| Product | Utility Trailer Kit |
|---|---|
| Vehicle application | Changan CS75 |
| Intended use | Track Days |
| Base material | Sintered Metal |
| MOQ | 500 pieces per specification |
| Sampling | 10 working days, 5 days per revision |
| Compliance | TUV |
Why this version
- Material — Sintered Metal, chosen for the track days duty cycle rather than for showroom appearance.
- Capacity — sized for continuous use, not for intermittent demonstration use.
- Mounting — fixed to the Changan CS75 without modification to the vehicle.
- Service — wearing parts are replaceable without replacing the whole unit.
- Packing — carton sized for a warehouse shelf, marked to your barcode.

Related lines
- Snow Chain
- Wheel Cover
- License Plate Frame
- Trailer Hitch
- Car Antenna
- Cargo Carrier
Fitment notes
Confirm the fitment against the VIN or the frame number before ordering; two model years often share a name and not a part.
Ordering checklist
- Confirm the model year, market version and mounting points.
- State the duty cycle; track days is not the same specification as occasional use.
- Approve a sample built from bulk material.
- Fix packing and marking before the first container.
- Inspect before balance payment.
Questions buyers ask
What is the minimum order quantity?
The standard MOQ is 500 pieces per specification. Mixed sizes inside one shipment are accepted once the total reaches that figure.
Can the specification be held on file?
Yes. Once approved, the specification is recorded against your part number so a reorder reproduces the TUV-compliant build instead of a fresh interpretation.
How long does sampling take?
Samples leave the factory in 10 working days, and each revision round adds about 5 days once you have seen the first piece.
Can you match an existing sample?
Send a sample and we will reverse-engineer the specification, then produce a counter sample for approval before any bulk starts.
Share a sample or a drawing and we will quote against a written specification, not against a photograph.






